Project Pages
Projects Planned for Development
The Lenawee
The Lenawee is proposed mixed use structure to be constructed on the site of the Old YMCA on Lenawee St. The building was proposed in the Spring of 2008 by the Lawton Group, a local realty company. The building will have a 4 floor parking garage on floors 1-4, which will also have ground floor retail facing Lenawee, floors (read more…)
City Center Studios
City Center Studios was proposed as a joint venture between local developer Pat Gillespie and Ahptic Studios, with other partners potentially coming on board also. The building will go on the land formerly occupied by A1 rental, between Cedar & Larch, south of Erie St. The project will have two 24,000 sq ft sound stages that may be combined, the stages will have 50′ ceilings, and numerous other amenities expected by (read more…)
Ottawa & Butler
Gene Townsend proposes this development for a block of state owned land bounded by Ottawa, Ionia, Butler and Sycamore. The block has been mostly vacant for many years, except 9 houses, 4 of which are currently state-owned and vacant, 2 will be razed the others will be rehabbed or remain with their current owners. The development includes (read more…)
Lansing Gateway
The Lansing Gateway is a mixed-use project proposed by Gene Townsend. The building will be built on the city owned parking lot on the north side of Kalamazoo St between Cedar and Larch, the properties to the north will be razed for a new parking lot. It will be four floors and approximately (read more…)
Ball Park North
Ball Park North along with Market Place is part of a duo of projects proposed by Pat Gillespie. Ball Park North will be constructed between Cedar & Larch, south of Shiawassee and north of Olds Park. The development includes (read more…)
Capitol Club Tower
Capitol Club Tower was announced by two small local developers in May of 2007. It is to be built on the site of the former Lansing City Club and adjacent three floor building, it would also include the purchase and rehab (read more…)
City Center II
City Center II is a mixed use development slated to be built at Grand River and Abbott in East Lansing, mostly on the site of the former Citizens Bank Building. The structure is to be twelve floors tall, floors (read more…)
Projects Under Construction
Market Place
Market Place, along with Ball Park North is part of a duo of projects proposed by Pat Gillespie. Market Place will occupy the land southwest of Shiawassee & Cedar, down to Museum Dr, this will inlcude razing the current City Market. The development is to include (read more…)
Accident Fund Headquarters
Accident Fund Insurance Co. announced that the former Ottawa Power Station would be rehabbed into their new headquarters. They plan to change the entire area around the building, with the building and adjacent property becoming (read more…)
Michigan State Police Headquarters
The Michigan State Police Headquarters was originally proposed in 2002 as a joint headquarters with the Department of Military & Veterans Affairs. It was planned to be over 400,000 sq ft and cost over $100 million. Since then, Military & Veterans Affairs has pulled (read more…)
Completed Projects
LCC University Center
The University Center will be 37,000 sq ft total, 22,000 sq ft of new construction and 15,000 sq ft in the renovated Carnegie Library building. The building will be on the Northwest corner of Capitol and Shiawasee, occupying (read more…)
The Hollister Building
The Hollister Building is the oldest large commercial structure in Lansing, it was originally built in 1896, with an addition in 1901. The Boji Group, owners of the Capitol View Tower, Boji Tower (former Michigan National tower), the Tower (read more…)
Sparrow West Wing Expansion
The Sparrow West Wing expansion is the largest in the hospitals history. The entire building will not be utilized immediately, but instead will be built out over the next several years. When built out the building will contain 22 operating (read more…)
Gaslight Village
Gaslight Village is a mixed-use project on Abbott Rd in East Lansings Northern Tier. It has approximately 19,000 sq ft of ground floor retail and 20 two-floor condominiums above. The condos will cost $185,000-$200,000. There will also be 40 two-floor (read more…)
The Stadium District
The Stadium District is a four floor Mixed use development proposed by developer Patrick Gillespie. The building is slated to begin construction in the Summer of 2006 and be completed by Fall of 2007. The building is to occupy (read more…)
Albert Place Condominiums
Albert Place Condominiums is a condominium development on the old Lot #7, at the southeast corner of Albert & Bailey streets. This was developed by Cron Management, the developers of Stonehouse Village I and the proposed Stonehouse Village II. This (read more…)
The Beaumont
The Beaumont is 40 acre mixed use development on Coleman Rd in East Lansings Northern Tier. The development will consist of 26 bungalows, 80 rowhouse-style townhomes, 56 luxury flats, 272 apartments (read more…)
West Village
West Village is a Mixed-Use development at Grand River and Hillcrest in East Lansing. The development is slated to contain 15 rowhouse style townhouses in two buildings, one along Grand River and on along Hillcrest. There will (read more…)