I noticed the new Clock Tower on the LCC campus is nearing completion. They have yet to install the clock faces, but so far it looks really nice and is a great improvement over the smoke stack/guard tower that was there for so long.
I came across this proposal for update to the center of LCC's campus. The design is buried in a proposal for the Royal Oak City Center project as a reference, https://www.romi.gov/DocumentCenter/View/23287/PEA---BID (page 51).
I got a new bike for Christmas which I know jinxes the spring weather, but once it turns nice I will take a bike tour to see the campus, some of the features are in place I believe.
Comments
I noticed the new Clock Tower on the LCC campus is nearing completion. They have yet to install the clock faces, but so far it looks really nice and is a great improvement over the smoke stack/guard tower that was there for so long.
I came across this proposal for update to the center of LCC's campus. The design is buried in a proposal for the Royal Oak City Center project as a reference,
https://www.romi.gov/DocumentCenter/View/23287/PEA---BID (page 51).
Looks really nice!
I have not been through the campus in a while, has this plan been built?
I haven't been by either, but the post says "Design proposal complete: 2018, awaiting funding" so I would assume it hasn't been completed.
I got a new bike for Christmas which I know jinxes the spring weather, but once it turns nice I will take a bike tour to see the campus, some of the features are in place I believe.