The Abbot & The Graduate (Park District)

1313233343537»

Comments

  • The steel workers "topped" the credit union building with a flag and pine tree, and the exterior construction phase has begun. I am happy that it will be a first-class building, but from the north the building looks like it was split in half because of the huge dark wall. I wonder why they did not include some windows on that side of the building. I can see that is where the elevators and utilities will be, but I could see windows in the stairwells, they would have had a great view, just my thoughts on this project.
  • The red brick façade on the credit union building is going up quickly, and it looks good and a nice contrast to the dark charcoal bricks of the northside "monolith" wall. I also like the curve that bends down the west side, there could have been just more box shapes it was nice they put the curve in the design.
  • There is an artical in the LSJ.com about the redevelopment of Valley Court Park. I like the plan and I would enjoy having a pavilion for the farmers market, it can get really hot out there.
  • Crews have been installing the window walls on the credit union building, they look really nice, and the building is looking like a proper downtown office building.
Sign In or Register to comment.