
Jared
Jared
About
- Username
- Jared
- Joined
- Visits
- 2,656
- Last Active
- Roles
- Administrator, Moderator
Comments
-
I have an update on the construction. The trusses for the roof are going in and they appear to very far along in the construction. Units should be ready to move in to by Fall. Here are some pictures: My PhotoStream on Flickr
-
As a followup to the post right above. They have actually just replaced the streetside parking and redone the curbs for it. It will still remain. I got a picture of one of the buildings in the University Village development. It looks structura…
-
I went out and took some pictures in the last couple days. Here is a picture of where the West Village development stands. They have what appears to be the cement in for the steps for rowhouses, and they also have the walls poured for what looks l…
-
I believe that's either Sultans or India Palace. I didn't know that they had permits for dancing.
-
Yes, that would be me. Funny how small the world is.
-
Here is a photo I got courtesy of Fran Wilcox from The Towne Courier: Stored on Flickr And some larger better quality renderings: Stored on Flickr Stored on Flickr
-
No, it's not illegal, but it definitely would unethical to do so. And East Lansing doesn't have rent control laws, but the general idea of rent control laws wouldn't work in this type of situation. Rent control laws work to keep the rent from incr…
-
I like C and E. I like E's rivertrail and winter garden plaza. I like C's building orientation. I think there is something very interesting to call to attention or to predict. Recently The Pierce Company, the developers of this project, purcha…
-
Yeah, a photo tour on my behalf is needed too. I have got to plan to try and make some time to go out and take photos. I think I'll actually be able to do so pretty soon though.
-
I have found copies of the five original design concepts if you would like to look through them. The current design is a hybrid of a couple of these. [ulist][li]Concept A[/li][li]Concept B[/li][li]Concept C[/li][li]Concept D[/li][li]Concept E[/l…
-
nice to hear! as this is the third phase, and with each phase having a slightly different design, how do you think the design will change this time?
-
Yes, the delay is due to the property acquisition phase and also the funding. The possibility of it being developed in two phases deals with the market demand and the funding.
-
From their website: Location: The site is bounded by East Grand River Avenue (north), Hagadorn Road (east), Bogue Street (west) and the Red Cedar River (south). The site is contiguous to MSU on two sides (Bogue and Red Cedar River). Developer: T…
-
If I remember it is 4,780 spaces. The project is schedule to start construction in 2009
-
Yeah the hotel will be eight floors and most of the residential will be around 5 floors. These pictures were also given to us at the workshop to talk about different ideas. The retail that is masking the parking ramp would be masking it on all sid…
-
I went to the design workshop today at the Kellogg Center and got to take a first hand look at how it is currently planned. They had a formboard display of the entire site, and it didn't look too bad. My only gripe was the lack of some form of ped…
-
The homepage for develop, a wordpress blog, isn't really updated often due to the question of where to post development updates. So, my question to the public is, how should the homepage for the site be used? Some ideas are: [ulist][li]Upcoming…
-
WANT TO HEAR FROM THEM? Representatives from The Pierce Company Inc. will be sharing an updated design concept with East Lansing officials. The representatives are scheduled to speak at the following meetings, which are open to the public: • C…
-
East Village design to include city, residents' input By KRISTEN DAUM The State News And then there was one. When Pierce Company officials left East Lansing five weeks ago, they said they'd return after narrowing down five preliminary desi…
-
I drove by the apartments on Clippert today and they are working on the second floor. The rumor that I heard is that DTN has bought up all remaining properties on that strip and they plan to build much more student housing there. This is across …