Also, a minor edit for my last post in this thread: My math there assumed a 12-month lease, but if buildings are targeted towards students then the developer may be budgeting for 9-month leases (12-month leases would be a bonus this way). That being said, this sets the leases to $2.75/sqft, still above the $2/sqft magic rate.
Masonry has been completed, and the metal panels are going up along the rest of the tower. The 7/11 is nearly complete on the ground floor. Pavers are going in on the site and landscaping will commence next week.
I agree it's confusing. To embed an image from another site, use the [<>] button. This should also work for link previews but they disappear for me upon posting. Highlighting some text then clicking on the Link button that pops up works for me.
I'll probably end up switching back to Markdown if I can't fix these issues.
Georgio's Pizza is now open, after closing for 2 years for construction of The Hub and then delaying their opening due to covid-19. This now means that the Hub has all storefronts occupied (the other being 7-11 which has been open for some time).
Comments
The 4th floor of the building has now been poured and the interior walls have been roughed in. Work is beginning on the 5th floor interior walls.
EastLansingBuzz posted an update and included a picture,
https://www.eastlansingbuzz.org/single-post/2018/11/16/Construction-Update-11-16-18
Also, a minor edit for my last post in this thread: My math there assumed a 12-month lease, but if buildings are targeted towards students then the developer may be budgeting for 9-month leases (12-month leases would be a bonus this way). That being said, this sets the leases to $2.75/sqft, still above the $2/sqft magic rate.
This one is almost done: https://www.eastlansingbuzz.org/single-post/2019/07/12/Construction-Update-07-12-19
Masonry has been completed, and the metal panels are going up along the rest of the tower. The 7/11 is nearly complete on the ground floor. Pavers are going in on the site and landscaping will commence next week.
Move-ins began today:
Move-in was delayed at Hub apartments until building got city approval Wednesday afternoon
https://www.lansingstatejournal.com/story/news/2019/08/21/move-was-delayed-over-inspection-problems-hub-apts-near-msu/2073072001/EDIT: Why isn't the link showing up, and why can't I post pictures from the internet? It sends you to your computer to attach and image.
Move-in was delayed at Hub apartments until building got city approval Wednesday afternoon
Move-in was delayed at Hub apartments until building got city approval Wednesday afternoon
https://www.lansingstatejournal.com/story/news/2019/08/21/move-was-delayed-over-inspection-problems-hub-apts-near-msu/2073072001/I agree it's confusing. To embed an image from another site, use the [<>] button. This should also work for link previews but they disappear for me upon posting. Highlighting some text then clicking on the Link button that pops up works for me.
I'll probably end up switching back to Markdown if I can't fix these issues.
Georgio's Pizza is now open, after closing for 2 years for construction of The Hub and then delaying their opening due to covid-19. This now means that the Hub has all storefronts occupied (the other being 7-11 which has been open for some time).
ELI reporting: https://eastlansinginfo.news/after-two-years-georgios-gourmet-pizza-is-back-on-grand-river-avenue/