  • There are footings in now, I'm not sure how many, but I see some along Kalamazoo at least. Hopefully we'll see steel rise in 1-2 months.
  • edited April 2008
    Some pictures of the progress from today:
    MSP2.jpg

    MSP3.jpg
  • I'm going to try, sometime, to get some photos from the Kalamazoo Street Bridge. This way, you get a semi-aerial view of the entire site.
  • Still haven't gotten any pictures, but it appears construction has simply stopped. I wonder what the hold-up is?

    BTW, I was looking through the US Green Building Council's website, and it appears that the developer has registered to have this project LEED-certified, which is something I had not know that they were shooting for. It will be interesting to see what level they are shooting for.
  • They are still working on it, I drive by there everyday. There has been very little progress, but there have been people onsite doing things. The only thing I can figure is their letting the footings set, but I'm guessing we should see some good progress being made within a couple weeks.
  • edited June 2008
    June 1st:

    2543558318_d5e13bd9df_o.jpg

    2543558268_e597d084b8_o.jpg
  • I was going to ask about the pace of construction but I see it's already been covered.

    2545635970_3f6dc7491f_b.jpg

    2545636772_72c80a5e62_b.jpg

    2544812147_e6c228da93_b.jpg
  • Just FYI, there is a crane onsite now.
  • Yep, the steel is on site. This is good to see.

    2582558094_69ab05ebf9_o.jpg

    2582558098_144663bdd8_o.jpg

    2582558104_c65a565f95_o.jpg

    2582558090_f153383600_o.jpg
  • They are putting the steel up pretty quickly, I'll try to get a pic today or tomorrow.